Compliance after the audit
ZeroTB keeps controls working after the audit, including the checks and repairs that new accounts, devices and system changes require. Our team and software do that ongoing work. Compliance gets evidence of completed repairs and can see which controls still need attention as the company changes.

Works with the stack you already run
Controls that lapse between reviews
An audit repair can stop working after the next change to an account, device or system. The earlier evidence still shows a successful repair. If nobody checks the new state and owns the response, the same failure can return at the next review.
An audit issue is repaired
Systems change after the repair
The same control fails again
Support for the work between audits
ZeroTB carries the ongoing repair work across compliance, IT and engineering. Our team and software operate the controls, with commitments, checks, repairs and evidence together in ZeroTB. Control operations provides this continuing support after the Pilot.
Your control records stay in ZeroTB
ZeroTB carries the work through repair
People retain decisions about material changes
Control repair process
We read the reports and policies, confirm requirements with your team and check the affected systems.
We give each gap an owner and a proposed repair. Your people approve material changes.
ZeroTB checks that the control works before closing the repair, then retains the result in a signed record.
Example of limiting access to approved work accounts
The Verified Control Record gives a reviewer the evidence behind a completed repair. This sample concerns access through a personal account. The record links the restriction to its approval and shows the later check: personal access is blocked, and approved work access still operates.

Original requirement. The account restriction comes from the policy on work accounts and managed devices.
Approved action. A reviewer can see the approval for restricting access through the personal account.
Verified result. The final observation records that the restriction worked and approved access was preserved.
Talk to our team
Talk with our team about controls that need attention between audits and how compliance and engineering share that work.
FAQ
Can this support us as we add another compliance framework?
Yes. ZeroTB supports the controls beneath SOC 2, ISO 27001 and HIPAA requirements. Some of those requirements concern the same control. In that case, restoring it can satisfy several commitments, with the verified repair available as evidence for each.
How often are controls checked after the audit?
The requirement determines the checking schedule, which ZeroTB records with the commitment. There is a practical difference between checking a cloud setting that changes frequently and checking completion of a periodic access review. The schedule reflects the system or process involved.
Can ZeroTB follow work that depends on people completing a task?
Yes. A commitment can require someone to complete training, review a vendor or policy, or take part in an incident exercise. ZeroTB schedules and assigns that work. It escalates late tasks and verifies completion.
Can we begin without allowing changes to live systems?
Yes. Initial access is read-only. You can grant and revoke write access for particular classes of action. Reviewed pull requests are the default for material changes. Direct API actions need separate opt-in and limits on their scope, and must be reversible.
How will we know if a connection stops providing current evidence?
The control can show as unknown, stale or disconnected. ZeroTB keeps those states visible when evidence is missing or out of date. It needs a current observation that establishes the condition before reporting that the control is healthy.
Who decides whether a post-audit exception is acceptable?
Your people decide which exceptions to accept. They also confirm the meaning of the commitment that applies. AI helps investigate and proposes a response; authority over material actions stays with the people responsible for the decision.
Start with the Pilot
Start with eight weeks of work on your own controls. The Pilot maps up to 25 commitments from your report and takes two real gaps through verified restoration, leaving working controls and portable evidence of the repairs.